Our Hydropower Plant “Ado Popinhaki” on the Canoas River, which forms part of the Uruguay River Basin, is located in the state of Santa Catarina, Brazil.
Its nominal installed capacity is 22.6 MW, which means that it generates energy equivalent to the annual consumption of 50,000 households. It has been in operation since 2018.
Date | Status | Power |
---|---|---|
2018 | In generation/production | 22 MW |
Date | Status | Power |
---|---|---|
2018 | In generation/production | 22 MW |